Completed Projects

Paragon, a professional consulting firm, offers high-quality services, advice, and purposeful activities in its specialized field, with a portfolio of accomplished projects backed by legally contracted agreements and Completion Certificates.

Sn.CategoryProject NameLocationCompletion YearClient
1EnvironmentEnvironmental Impact Assessment (EIA) for the Construction of Physical Infrastructure of Suryadal Battalion at DevidandaLalitpur district2026Suryadal Battalion, Nepali Army
2WSSThe World Bank funded Technical and Governance Support to Sharada Municipality and Janaki, Joshipur & Bardagoriya Rural Municipalities with One Independent Team for Each Municipality (NP-DWSSM-290176-CS-QCBS)Salyan and Kailali districts2026Water Sector Governance and Infrastructure Support Project, PMU, DWSSM
3WSSThe World Bank funded Urban Water Supply, Technical Design, Supervision and Governance Support in Birendranagar Municipality in Surkhet and Dipayal-Silgadhi Municipality in Doti, with one team in each municipality (NP-DWSSM-290178-CS-QCBS), (Credit No. 7132-NP)Surkhet and Doti districts2026Water Sector Governance and Infrastructure Support Project, PMU, DWSSM
4BridgeBishnumati Pedestrian Bridge (28.3m) between Chamati- Bishnumati Kinar and Khusibu- Bishnumati Kinar RoadKathmandu2025Kathmandu Metropolitan City, 16 No. Ward Office, Balaju
5EnvironmentInitial Environmental Examination (IEE) of Construction of Urban Road and Improvement Works in Tulsipur Smart City (NTPCO-CS-25-078/79)Dang district2025New Town Project Coordination Office, DUDBC
6EnvironmentPreparation of IEE Report of Construction of Lamjung District Hospital (50 Beds)Lamjung district2025Province Hospital, Besisahar, Lamjung
7GeotechDetail Geotechnical/Geophysical Study, Detail Design/Drawing & Cost Estimation of Slope Stabilization and Protection Works at Army Intelligence School, Laptandada (MIS/CS/2081/82-01)Bhaktapur district2025Nepali Army, Army Military Intelligence School
8IrrigationDetailed Feasibility Study with Engineering Design of Salyantar Lift Irrigation Project (DWRI/IFSCQP/2080/81/EOl-02)Dhading district2025Department of Water Resources and Irrigation
9LandslideDevelopment of Landslide Initiation and Nowcast System in Gandaki Province (WRRDC/GEO/RFP/09/2081/82)Gandaki Province2025Water Resources Research and Development Centre (WRRDC)
10LandslideDetail Geotechnical/Geophysical Study, Detail Design/Drawing & Cost Estimation of Slope Stabilization and Protection Works at Army Intelligence School, Laptandada (MIS/CS/2081/82-01)Bhaktapur district2025Nepali Army, Army Military Intelligence School
11LandslideIntensive Flow Measurement and River Cross-section Survey in Koshi Basin (OHMD/C/EOI-01/2081/82)*Sankhuwasabha, Dhankuta, Kavre, Dolakha, Taplejung, Panchthar, Bhojpur & Okhaldhunga districts2025Office of Hydrology and Meteorology,
Dharan, Sunsari
12MasterplanPreparation of Comprehensive Physical Development (Master) Plan of Kathmandu Valley (comprises of 18 municipalities and part of 2 rural municipalities, altogether covering an area of 721 sq. km.)Kathmandu, Bhaktapur and Lalitpur districts2025Kathmandu Valley Development Authority (KVDA)
13MasterplanFeasibility Study and Master Plan Preparation of Equine Breeding Centre (NA/DOS/CS/081/82/01) at ShaktikhorChitwan district2025Directorate of Sthapati, Nepali Army
14OtherIntensive Flow Measurement and River Cross-section Survey in Koshi Basin (OHMD/C/EOI-01/2081/82)*Sankhuwasabha, Dhankuta, Kavre, Dolakha, Taplejung, Panchthar, Bhojpur & Okhaldhunga districts2025Office of Hydrology and Meteorology,
Dharan, Sunsari
15RoadSurvey, Design and DPR of Roads (PMEU/33701123/081/82/DPR-03):
1) Subhasratna Smriti Marga Ilam Chhettra No. 2 Blacktop (28 Km)
2) Ilam Na.Pa. 10 Simal Golai-Mai Jogmai Ga.Pa. Maibeni-Tilkeni Road (14 Km)
Ilam district2025Department of Roads (DoR)/ PMES
16SupervisionDesign and Supervision Consultant (DSC) of the World Bank funded Nepal Urban Governance and Infrastructure Project (NP-DUDBC-215999- CS-QCBS), (Credit No. IDA-6778-NP) at Damak MunicipalityJhapa district2025Damak Municipality
17SupervisionConstruction Supervision of Damak Shopping Complex at Damak
Total Project Cost: NRs. 434.44 million
Jhapa district2025Damak Municipality
18SupervisionDesign and Construction Supervision of Modern Sauna Steam and Jacuzzi Fittings Works at Judo Hall at SorhakhutteKathmandu2025Kathmandu Metropolitan City
19WSSPreparation of DPR of a) Shyama Khola Dingla Water Supply Project (WSP), Sadananda 4-9, Bhojpur; b) Pathari WSP, Sanischare, Morang; c) Kunakhola WSP, Lalitpur; and d) Sattala Sigaudhi Brihat Pumping WSP, Dailekh (CS/CRLWSP/DPR-PAC-1/079-80)Bhojpur, Morang, Lalitpur and Dailekh districts2025Climate Resilient Large Water Supply Project, DWSSM
20WSSFeasibility Study of Decentralized Wastewater Treatment System (DEWATS) in Lalitpur-29 (BIP-CS-02-081/82), project cost: NRs. 43,563,266.87Lalitpur district2025High Powered Committee for Integrated Development of the Bagmati Civilization
21EnvironmentIEE for Sustainable Collection and Extraction of Sand, Stone, and Gravel Deposits from the Right Banks of the Sunkoshi and Indrawati RiversKavrepalanchowk district2024Bhumlu Rural Municipality
22HydroMonitoring of Energy Generation and Community Benefits of Mini/Micro-Hydro under Clean Development Mechanism (2024/2025) under Contract No. AEPC/CCU/EoI/2081/82-0250 districts in Koshi, Bagmati,
Gandaki, Lumbini, Karnali and Sudurpaschim Provinces
2024Alternative Energy Promotion Centre (AEPC)
23ManpowerMobilization of Safeguard Officers for ESMU at Khandichour under Tamakoshi-Kathmandu 220/400kV Transmission Line Project (ESSD-24-2080/081)*Sindhupalchowk district2024Nepal Electricity Authority, ESD, ESSD
24ManpowerMobilization of Safeguard Officers for ESMU at Khandichour under Tamakoshi-Kathmandu 220/400kV Transmission Line ProjectSindhupalchowk district2024Nepal Electricity Authority, ESD, ESSD
25OtherEvaluation of Completed Projects of KMCKathmandu2024Kathmandu Metropolitan City
26RoadFeasibility study of Thathali-Rabiopi Road Tunnel, Bhaktapur (2 tunnels), Project cost: NRs. 2,0943.88 millionBhaktapur, and Kavre districts2024Department of Roads (DoR), Quality Research & Dev. Centre
27RoadDetailed engineering survey, DPR, IEE, and EIA for the following roads (PMEU/3371594/075/76/DPR-26):
1) Rukum-Jajarkot Section of Lumbini-Rara-Mugu Road (52.80 Km) (DPR+EIA), Rukuk-Jajarkot; 2) Jumla Bazaar to Urthu Syaulagadigaun Chotra Road (33.00 Km), (DPR+IEE), Jumla; 3) Chisapani Tallobagar Section of Bheri Corridor (28.00 Km), (DPR+IEE)
Rukum, Jajarkot and Jumla districts2024Department of Roads (DoR), Planning Monitoring & Evaluation Section (PMES)
28SupervisionUSAID funded Assessments, Design and Technical Supervision Services for Disaster Mitigation Infrastructure Project in Lamkichuha Municipality
(RFP-TAYAR-KMD-23-0043)*
Kailali district2024Tayar Nepal
29SupervisionUSAID funded Assessments, Design and Technical Supervision Services for Disaster Mitigation Infrastructure Project in Bhimeshwor Municipality
(RFP-TAYAR-KMD-23-0041)*
Dolakha district2024Tayar Nepal
30WSSLamahi Co-Finance Water Supply and Sanitation Project (DPR- 02/CFWSSP/2079-80) at Ward 2-7 of Lamahi Municipality, Total project cost NRs. 445.265 million*Dang district2024Co-Finance Water Supply and Sanitation Project
31WSSPreparation of DPR of New Town Project Office (Ladauli- Dangsili Water Supply Project) at Patan Municipality-1Baitadi district2024New Town Project Office, Patan, Baitadi
32BridgePreparation of Study for Site Selection, Detail Engineering Survey, Geotechnical/ Hydrological Investigation and Detailed Design of Bakraha Khola Bridge, Miklajung-2*Morang and Ilam districts2023Miklajung Rural Municipality
33BridgeThalaha Khola (21.2m) and Garaun Khola (21.2m) Bridges along Inaruwa- Duhabi Road*Sunsari district2023Infrastructure Development Office, Morang
34BuildingPreparation of Detail Project Report (DPR) of Administrative Building, Health Post, School Building, Road, Park, Picnic Spot & Tourism Area (RFP/SPRM/DPR/01/079/80)Sankhuwasabha district2023Savapokhari Rural Municipality
35BuildingMonitoring, Analysis and Reporting of Multi-Hazard Risk Assessment of Public Buildings (NP-NDRRMA-313540-CS-CQS) under Earthquake Housing Reconstruction Project (EHRP), financed by the World Bank (IDA: 65300)Panchthar, Ilam, Morang, Sunsari, Saptari, Sindhupalchowk, Tanahu, Manang, Rupandehi, Surkhet, Kailali, Doti and Dadeldhura districts2023National Disaster Risk Reduction & Management Authority
36BuildingPreparation of DPR with Detailed Assessment of Public Facilities (Package II), (IDA Credit 65300, NP-NDRRMA-315395-CS-CQS) under Earthquake Housing Reconstruction Project (EHRP) in Selected 9 Facilities*Tanahun, Jajarkot, Kanchanpur, Syangja, Dang, Rupandehi and Parbat districts2023National Disaster Risk Reduction & Management Authority
37LandslideGlacial Lake Outburst Flood (GLOF) Early Warning System for Tsho Rolpa Glacial Lake, Dolakha (DHM/C/RFP/11-2078/79)*Dolakha and Ramechhap districts2023Department of Hydrology and Meteorology
38LandslideDevelopment of Probable Landslide Mapping and Forecast System in Province-1 (Koshi) in FY 2079/080Koshi Province2023Water Resource Research and Development Center
39LandslideRisk Assessment of Disaster-Prone Areas in Nepal; Flood (Package II), (NDRRMA/EHRP-PIU/CS/NCB/2079-80), (IDA World Bank funded)Chitwan, Dang and Gorkha districts2023National Disaster Risk Reduction & Management Authority
40ManpowerMobilization of Safeguard Officers for Barhabise- Lapsiphedi Chagunarayan section under Tamakoshi-Kathmandu 220/440 kV Transmission Line ProjectSindhupalchowk district2023Nepal Electricity Authority, ESD, ESSD
41MasterplanPreparation of Master Plan and DPR for the Establishment of ISO Lab within Province No. 1, Nepal (MoFESC/P1/RFP/2079/080-04) at Tarahara; Total project cost: NRs. 405.313 million*Sunsari district2023Ministry of Tourism, Forest and Environment, Koshi Province
42OtherStrengthening of TDF's Appraisal System (01/STA/RFP/TDF/077/78)*Kathmandu2023Town Development Fund
43River TrainingRisk Assessment of Disaster-Prone Areas in Nepal; Flood (Package II), (NDRRMA/EHRP-PIU/CS/NCB/2079-80), (IDA World Bank funded)Chitwan, Dang and Gorkha districts2023National Disaster Risk Reduction & Management Authority
44RoadDetailed engineering survey, design, and report preparation for double lane standard roads (PMEU/33701123/079/80/DPR-05):
1) Bakachoi (DB)- Salleri Road Section (50 Km) of NH-23; and 2) Diktel- Bakachoi (DB) Road Section (39 Km) of NH-23
Dolakha, Khotang and Solukhumbu districts2023DoR, PMES
45RoadFeasibility Study of Ring Roads (DUDBC/CS/QCBS/02/078/79):
1) Banauli-Kurtha-Andhupatti-Lohana-Banauli (31.7 Km), Dhanusha; 2) Baruwa Bus Park-Shakela Marg-Chuhade Chowk-Jaljale-Bagaha-Kirat Rai Chowk-Motiyahi-Jogidaha-Setikali Devi Mandir-Baruwa Bus Park (35.9 Km), Udayapur; 3) Ithara-Kohabara-Gauriganj-Thekitole-Juropani-Gauradaha-Kyampa Bazar-Jungle Narsari-Chulachuli-Madhumalla-Urlabari-Rajghat-Ithara (81 Km), Jhapa
Dhanusha, Udayapur and Jhapa districts2023Department of Urban Development and Building Construction (DUDBC)
46WSSDetail Survey and Estimate (DPR) Preparation of WSP Projects under Package-3, (RFP-DPR-03/2078/079):
1) Juke WSP; and
2) Barahchhetra Brihat WSP
Udayapur and Sunsari districts2023Federal Water Supply & Sewerage Management Project, Biratnagar
47WSSDetailed Survey, Design, Cost Estimate and Study Report Preparation of Rumjatar Brihat CFWSSP (CFWSSP/DPR/04/2078-79), population: 10759, Total project cost: NRs. 535.278 millionOkhaldhunga district2023Co-finance Water Supply and Sanitation Project, PMO, DWSSM
48GeotechGeotechnical Investigation Work and Prepare Geotechnical Investigations Report at Mahakulung TaalSolukhumbu district2022Mahakulung Municipality
49IrrigationStudy of Groundwater Potential Zones in Part of Molung Rural and Siddhhicharan Municipalities in FY 2078/79 under Integrated Energy & Irrigation Special ProgramOkhaldhunga district2022Department of Water Resources & Irrigation
50MasterplanPreparation of Master Plan and DPR for Development of Both Sides of Dudhmati River as Corridor of Janakpur Sub-Metropolitan (DUDBC/CS/QCBS/04/077/78), Total project cost: NRs. 3609.26 millionDhanusha district2022Department of Urban Development and Building Construction (DUDBC)
51MasterplanPreparation of Periodic Plan of 3 Local Governments of Bagmati Province (Thaha-Makwanpur, Dhunibesi-Dhading & Netrawati Dobjong-Dhading), (NCB/Consulting/RfP/Periodic Plan/Cluster 4)*Makawanpur and Dhading districts2022Provincial Center for Good Governance, Bagmati Province
52MasterplanPreparation of Periodic Plan of 4 Local Governments of Bagmati Province (NCB/Consulting/RfP/Periodic Plan/Cluster 3)*Chitwan, Nuwakot and Sindhuli districts2022Provincial Center for Good Governance, Bagmati Province
53MasterplanPreparation of Detailed Master Plan of KHUMAL Complexes (NARI & NASRI) in FY 2078/79, Total builtup area: 587.924 m2, Total project cost: NRs. 1,448.50 millionLalitpur district2022National Agricultural Research Institute, NARC
54MasterplanPre-feasibility Study of SMART InfrastructuresKaski, Bara and Sunsari districts2022Ministry of Industry, Commerce and Supplies
55River TrainingDetailed Survey, Design and Report Preparation of Ladara and Budhi Rapti Khola River Training Master Plan (CS/MOWSE/WREDD/RFP-02/2078/079)Chitwan district2022Ministry of Water Supply, Energy and Irrigation, Government of Bagmati Province
56RoadPreparation of DPR & IEE of Sindhukhola- Giranchaur- Haibung- Patibhanjyang Road (13.09 Km)Sindhupalchowk district2022Department of Roads (DoR), PMEU
57RoadSurvey, design & report preparation (PMEU/33701123/076/77/DPR-31) of 1) Phedikuth-Koshat-Mandredobhan-Okhaldhunga section of Sanghutar- Okhaldhunga-Kuivir Road (77.095 Km);
2) Sinam-Yambhudin section of Limbuni Pul- Kanchanjunga Base Camp Road (Kabeli Corridor), (30.50 Km)
Okhaldhunga and Taplejung districts2022Department of Roads (DoR), PMEU
58RoadMorang- Kerabari- Sammewa- Dhakuta- Kajiman- Jorpati- Chhathar Road, Dhankuta (22.689 Km), (PMEU/33701123/077/78/DPR-12)Dhankuta district2022Department of Roads (DoR), PMEU
59SupervisionConstruction of Agriculture Cooperative Markets in Regional, District and Municipal Level of Bagmati Province under Cooperating Market Development Project, total project cost: NRs. 103 millionChitwan, Nuwakot, Lalitpur, Kavre and Dhading districts2022Cooperative Market Development Programme (CMDP), (a joint programme of GoN & UNDP)
60TourismDetailed Survey, Design and Cost Estimate of Tourist Service Center (Buildings) at Dhangadhi Municipality (DOT/CS/TD-3/078-79)Kailali district2022Tourism Department
61WSSFeasibility Study of Hile Kholsi Integrated Impounding Reservoir Project (02/DRATS/Feasibility/2078-079) at Shankharapur-3; Total project cost NRs. 1091.55 million*Kathmandu2022Design Research and Appropriate Technology Section, DWSSM
62WSSSurvey, Design, Estimate & Report Preparation of Co-financing Water Supply and Sanitation Project (DPR-01/CFWSSP/2077-78): 1) Kolti Bajura (58.88 Kms, popn: 10158, Project cost: NRs. 239.022 million), Design Discharge: 18.25 lps; 2) Lamki Chuwa, Kailali (315.74 Kms, Design discharge: 116.45 Ips, popn: 46069, Project cost: NRs. 1010.256 million); and 3) Sukhad Darakh, Kailali (328.15 Kms, Design discharge: 101 lps, popn: 32706, Project cost: NRs. 748.586 million)Sudurpaschim Province2022Co-finance Water Supply and Sanitation Project, PMO, DWSSM
63AgriculturePreparation of DPR of Infrastructure Development of Agriculture Market at Shivaganj, Shivasatakshi Municipality; Total Built-up Area: 13,607.25 sq.m.Jhapa district2021Shivasatakshi Municipality
64AgricultureDPR preparation for the Infrastructure Development of Agriculture Market (CAIDMP/CS/QCBS/03/2076/077):
1) Budhanilkantha Municipality-2 (Total built-up area = 2,721.79 sq.m.); and
2) Kageswari Manohara Municipality-1 (Total built-up area = 4,876.73 sq.m.)
Kathmandu2021Centre for Agricultural Infrastructure Development & Mechanisation Promotion
65BuildingPreparation of DPR and Environmental Impact Assessment (EIA) for National Defence University at Perunge Daanda, Sanga (NA/DQS/076/77/11)
Total Built-up Area: 46,353.51 sq.m. Total project cost: NRs. 8,034.89 million
Kavre district2021National Defense
University - Infrastructure Development Committee
66BuildingSoil Investigation, Detail Structural Analysis, Detailed Design and Preparation of Drawings for Office and Quarter Buildings of Road Division, Janakpur, Dhanusha and Road Division Chaurjahari, Rukum West (PMEU/33701123/076/77/BLD-01)*Dhanusha and Rukum West districts2021Department of Roads (DoR), PMEU
67BuildingPreparation of DPR for Construction of Primary Hospital (15-Bed) in FY 2077/78; Total built-up area = 3,421.77 sq.m.
Project cost: NRs. 210.45 million
Makawanpur district2021Bhimphedi Rural Municipality
68BuildingPreparation of DPR for the Construction of district Hospital Building to Upgrade from 15 to 50 Beds at Beshishahar. Final designed capacity= 60 beds.
Total Built-up Area: 10,453 sq.m.
Project cost: NRs. 608.93 million
Lamjung district2021Gandaki Province, Ministry of Social Development
69BuildingPreparation of Detailed A/E Design of Mahakulung Primary Hospital Building (15 Bed), (MRM/01/RFP/077/78) at Bung
Total Built-up Area: 10,916.65 sq.m.; Project cost: NRs. 212.795 million
Solukhumbu district2021Mahakulung Rural Municipality
70BuildingPrepare Detailed Design, Estimate of Specified Monasteries including Soil Investigation of 19 Specified Monasteries (NRA/CLPIU/EMRP/EP/ 01/077/78); Total built-up area = 4,282.66 sq.m., Total cost of project: NRs. 611.974 millionKhotang, Lalitpur, Solu, Dolakha, Dhading, Nuwakot, Ramechhap, Rasuwa, Makawanpur, Kavre & Okhaldhunga districts2021Central Level Project Implementation Unit (CL-PIU)
71GeotechGeotechnical Investigation of Bridge Sites from Chainage 12+947 to 22+289 (KTFT/ GI/ RFP/ NCB/ 2077/78/02) under Kathmandu- Terai/ Madhesh Fast Track (Expressway) Road Project (KTFT)*Lalitpur and Makawanpur districts2021Nepali Army / KTFT
72LandslideDetailed Engineering Survey, Design, Drawing and Cost Estimate Preparation of Darchula- Tinkar Road (74.243 Km), (RFP/DODAC/2077/78-01)Darchula district2021Nepali Army
73MasterplanPreparation of Digital Profile of Bhageshwor Rural Municipality, BagarkotDadeldhura district2021Bhageshwor Rural Municipality
74MasterplanPreparation of Detailed Master Plan of Provincial Center for Good Governance at Lalitpur Metropolitan City in FY 2077/78; Built-up area = 3,697 sq.m., Total project cost: NRs. 709.461 millionLalitpur district2021Bagmati Province, Provincial Center for Good Governance
75MasterplanMaster Plan and DPR of Proposed Football Stadium (sport facilities) at Bhootkhelchaur, Tokha-3
Total builtup area: 16,888.24 sq.m.
Kathmandu2021Tokha Municipality
76MasterplanDPR preparation of Vyas Madi Valley Integrated River Development Project (VYASMUN/01/2076/077)Tanahun district2021Vyas Municipality
77RoadDetailed Engineering Survey, Design, Drawing and Cost Estimate Preparation of Darchula- Tinkar Road (74.243 Km), (RFP/DODAC/2077/78-01)Darchula district2021Nepali Army
78SupervisionPMC for the Construction Supervision of Academic Block of Chhetrapal Secondary School at ChaugadaNuwakot district2021Chhetrapal Secondary School
79SupervisionConstruction Supervision of Different Level Agriculture Cooperative Markets (CMDP/04/2020), Total project cost: NRs. 210 millionBagmati Province (8 districts)2021CMDP (a joint programme of GoN & UNDP)
80WSSDetailed Survey, Design, Cost Estimate and Study Report Preparation of Tilottama Co-financing Water Supply and Sanitation Project (CFWSSP/DPR/02/2077-78)
(Popn: 15,989, Design discharge: 45 lps), project cost: NRs. 439.49 million
Rupandehi district2021Co-finance Water Supply and Sanitation Project, PMO, DWSSM
81WSSDPR Preparation of Pithuwa Deep Boring Water Supply Project at Ratnanagar-16, Madhavpur (Popn: 6,480), Total project cost NRs. 129.33 millionChitwan district2021DWSSM, Federal Water Supply and Sewerage Management Project
82WSSSurvey, Design, Cost Estimate & Report Preparation of Co-finance Water Supply and Sanitation Projects (DPR-PKG-01/2076/077):
1. Dhadingbesi CFWSSSP, Neelkantha-2,3,4&12, Dhading (Transmission & distribution of pipe length: 80.196 Kms; Popn: 24,391), Design discharge: 62.25 lps, Project cost: NRs. 337.32 million; 2. Salyantar CFWSSSP, Tripurasundari-1&2, Dhading (Transmission & distribution of pipe length: 62.17 Kms; Popn: 13,650), Design discharge: 42 lps, Project cost: NRs. 298.52 million; 3. Sundar Bazar CFWSSSP, Sundar Bazar-2,5,6,7&9, Lamjung (Transmission & distribution of pipe length: 124.24 Kms; Popn: 16,451), Design discharge: 39 lps, Project cost: NRs. 319.87 million
Dhading and Lamjung districts2021Co-finance Water Supply and Sanitation Project, DWSSM
83BridgeDetailed Engineering Survey, Design and Cost Estimate RCC Bridge (10m span) across Bishnumati River, Gairigaun, Tokha-8Kathmandu2020Tokha Municipality
84BuildingDPR preparation for Reconstruction of Shree Ahimsabadi Sangh Chholing Gumba (Monastery) at Samri-1*Nuwakot district2020Central Level Project Implementation Unit
85LandslidePreparation of Landslide Inventory of Darchula District, Sudurpaschim ProvinceDarchula district2020Vulnerable Landslide Mgmt. Project, DWRI
86MasterplanFeasibility Study and Detail Survey, Design, Estimate of Mayadevi Stadium (6/NCB/BMO/KAPIL/EOI/76-77) at Banganga, Project cost: NRs. 881.316 millionKapilbastu district2020Banganga Municipality
87MasterplanPreparation of DPR of Proposed Cricket Ground (sport facilities) at KushmaParbat district2020Kushma Municipality
88RoadDPR Preparation (TID/P3/703363514/075/76/DPR-1) of:
1. Bhimeshowr Ring Road Project, Bhimeshwor Municipality, Dolakha- 43.025 Km, 2. Anathalaya Gaighat Road Project, Bhimeshwor Municipality, Dolakha- 9.18 Km
Dolakha district2020Bagmati Province, Transport Infrastructure Directorate (TID)
89SupervisionConstruction Supervision of Academic Block of Chhetrapal Secondary School at Chaugada, Total project cost: NRs. 215.90 millionNuwakot district2020Chhetrapal Secondary School
90TourismFeasibility study, DPR and Tender Document of Big-Buddha Statue along with related Infrastructure (Total floor area = 10,050 sq.m.) at Butwal*Rupandehi district2020Butwal Sub-Metropolitan City
91TourismPreparation of DPR of Multi Purposed Structures including Snanghat at Devghat, Bharatpur-1, total project cost: NRs. 202.64 millionChitwan district2020Tourism Development Project, Hetauda
92TourismDPR preparation for Tourism Infrastructures of Proposed Mahakulung Taal at Mahakulung Rural Municipality-2Solukhumbu district2020Mahakulung Rural Municipality
93WSSDetailed Engineering Survey and Design of Water Treatment Plants for Different Projects (WSSDO5/077/78/001Dhankuta:
(1) Nibuwa Khola WSS Project (Rehab.), Design discharge: 15 lps; (2) Salleri WSS Project (Rehab.), Design discharge: 8 lps; (3) School Dada WSS Project (Rehab.), Design discharge: 12 lps in Dhankuta Municipality, Ward nos. 5-7
Dhankuta district2020WSSDO-5, Dhankuta
94WSSPreparation of DPR of Various Water Supply Schemes (FWSSMP Dhangadhi/076/077/02):
(1) Ghatte Khola Pumping (Popn: 2,832);
(2) Bayalpata Lifting Pumping {Popn: 6,521, project cost: NRs. 200 million approx. (20 crore)}; (3) Mangalsen Brihat Pumping (Popn: 5,640); (4) Chhadena Bahubagauna Pumping & Gravity (Popn: 6,733); (5) Charibhakar Kadamandu Gairagaun Sanagau Gravity (Popn: 11,723); (6) Panchadeval NaPa Binayak Brihat Gravity (Popn: 5,659) Water Supply Projects
Achham and Doti districts2020Federal Water Supply and Sewerage Management Project , Dhagadhi
95WSSPreparation of DPR of Various Water Supply Schemes in Baitadi district (FWSSMP/076/077/03):
1) Sigas Brihat (Popn: 12,745), 2) Shreekot Deulek Brihat Pumping (Popn: 5,421), 3) Dilasaini Gaupalika Brihat Pumping (Popn: 8,768), 4) Barakot (Popn: 5,227), 5) Tallo Sorad (Popn: 2,782) Water Supply Projects
Baitadi district2020Federal Water Supply and Sewerage Management Project, Kanchanpur
96WSSDPR Preparation of Various Water Supply Scheme (WSSDO5/2076/2077/03 Dhankuta):
1) Solma Deep Boring WSP, Laligurans-8, Terhathum (Popn: 2,625, Deep tube well boring depth - 150m, 30 lps); 2) Myanglung Deep Boring WSP, Myanglung-10, Terhathum (Popn: 1,403, Deep tube well boring depth - 150m, 14 lps); 3) Dharmadevi Deep Boring WSP, Dharmadevi-8, Sankhuwasabha (Popn: 803, , Deep tube well boring depth - 150m, 15 lps); 4) Salpasilicho WSP, Salpasilicho-4, Bhojpur (Popn: 638)
Terhathum, Sankhuwasabha and Bhojpur districts2020Water Supply and Sanitation Division Office-5
97AgricultureDPR preparation for Regional Level Agricultural Cooperative Market (CMDP/UNDP/RFP/06/2019):
i) Outlet Building (3 storey) at Malpot Chowk; ii) Vegetable Market at Fulbari; Total built-up area = 2,545.25 sq.m.
Chitwan district2019Cooperative Market Development Programme, (CMDP), (a joint programme of GoN & UNDP)
98BuildingFeasibility Study, Preparation of Master Plan and DPR Preparation of Proposed City Hall and Bus Park at Shivalaya, Kushma Municipality-6 (KMO/075/076 EOI-01-01), Total project cost: NPR: 785.57 millionParbat district2019Kushma Municipality
99BuildingDPR preparation on Seismic Damage Assessment and Detailed Design of 4 Different Gumbas (Ghyangs) namely Chiri Ghyang, Tarke Ghyang, Melamchi Ghyang & Sermanthang GhyangSindhupalchowk district2019Department of Archaeology
100BuildingDPR preparation of Construction of Playground (sport facilities) at Tamankhola Rural Municipality-3*Baglung district2019Tamankhola Rural Municipality
101BuildingMaster Plan preparation and DPR of Proposed Old Age Home at Khareha, Kushma-7Parbat district2019Kushma Municipality
102HydroDetail Feasibility Study of Package III (AEPC/NRREP/CESC/RfP/2075/76-03): 1) Khani Khola III MHP (11 kW); 2) Khani Khola Falametar MHP (23 kW); 3) Khani Khola Latanee MHP (11 kW)*Kavre district2019Alternative Energy Promotion Centre, AEPDB
103HydroTopographical Survey and Mapping of Kimathanka Arun Hydroelectric Project under Kimathanka Arun Hydroelectric Project (450 MW) (NEC/KAHEP/CS/074/075/01)Sankhuwasabha district2019NEA Engineering Company Ltd.
104LandslidePreparation of DPR of Rural Roads in Ruby Valley Municipality:
i) Rauchet-Thowakhola-Borang-Riheubu-Sertung-Lapagaun- Paitise (42.228 Km); ii) Borang- Palika Bhawan- Awahoi- Sertung- Chaliso Hendung- Newor (30.504 Km); iii) Galgadada- Gombo- Fenchet- Khariha- Elchang (7.775 Km); iv) Chetchung- Fyang- Puru- Lingjo (7.878 Km); v) Chalis- Richet- Sitpyan- Kharka- Lahathan- Linjyo (5.998 Km); vi) Batasedada- Yangsung- Gobre Gaun (3.537 Km)
Dhading district2019Ruby Valley Rural Municipality
105LandslideDetailed Engineering Survey, Design and DPR of Kushma-Jhaaprebagar- Deupuja- Bhirmuni- Cycle Chowk-Gahate Pokhara-Thulipokhari-Rohote-Khaula-Aarthar-Bhanjyang Road (30.2 Km)Parbat district2019Kushma Municipality
106LandslideDetailed Engineering Survey and Design of Hakuberi- Pakling- Thulo Haku- Sano Haku Sadak and Bhaundada- Gre- Haku- Teri- Karunmang- Dadagau- Thulogau Road (14.09 Km)Rasuwa district2019Aamachhodingmo Rural Municipality
107MasterplanDPR preparation of Park, Picnic Spot, Suspension Bridge (90m), Temple and Temporary Dam Upstream of Jhor Waterfall as indicated in Boudeshwor Master Plan, TokhaKathmandu2019Tokha Municipality
108MasterplanMaster Plan and DPR Preparation of Proposed Bishnubatika Park, Pond & Children’s Park at Chuwa, Kushma-8Parbat district2019Kushma Municipality
109RoadPreparation of DPR of Rural Roads in Ruby Valley Municipality:
i) Rauchet-Thowakhola-Borang-Riheubu-Sertung-Lapagaun- Paitise (42.228 Km); ii) Borang- Palika Bhawan- Awahoi- Sertung- Chaliso Hendung- Newor (30.504 Km); iii) Galgadada- Gombo- Fenchet- Khariha- Elchang (7.775 Km); iv) Chetchung- Fyang- Puru- Lingjo (7.878 Km); v) Chalis- Richet- Sitpyan- Kharka- Lahathan- Linjyo (5.998 Km); vi) Batasedada- Yangsung- Gobre Gaun (3.537 Km)
Dhading district2019Ruby Valley Rural Municipality
110RoadDetailed Engineering Survey, Design and DPR of Kushma-Jhaaprebagar- Deupuja- Bhirmuni- Cycle Chowk-Gahate Pokhara-Thulipokhari-Rohote-Khaula-Aarthar-Bhanjyang Road (30.2 Km)Parbat district2019Kushma Municipality
111RoadDetailed Engineering Survey and Design of Hakuberi- Pakling- Thulo Haku- Sano Haku Sadak and Bhaundada- Gre- Haku- Teri- Karunmang- Dadagau- Thulogau Road (14.09 Km)Rasuwa district2019Aamachhodingmo Rural Municipality
112TourismPreparation of Feasibility Study and DPR of View Tower, Recreational Hall and Tourism Park in Hill Station at Chitlang, Thaha Municipality, Makawanpur (TDP/RFP/2075/76-01), Chaitlang, Thaha MunicipalityMakawanpur district2019Bagmati Province, Tourism Development Project
113TourismPreparation of Feasibility Study and DPR of View Tower, Recreational Hall and Tourism Park in Kakani Hill Station at Kakani Rural Municipality, Nuwakot (TDP/RFP/2075/76-06), Kakani Rural MunicipalityNuwakot district2019Bagmati Province, Tourism Development Project
114TourismPreparation of Feasibility Study and DPR of View Tower, Recreational Hall and Tourism Park in Rubi Valley Hill Station (View tower: Pansang, Community Hall: Sertung) at Ruby Valley Rural Municipality (TDP/RFP/2075/76-04)Dhading district2019Bagmati Province, Tourism Development Project, Province No. 3
115TourismDPR preparation of Provincial Martyr Park and Botanical Garden at Birendranagar-4, BhangerichaurSurkhet district2019Industry, Tourism, Forest & Environment, SWM Office
116WSSDPR Preparation of Proposed Salyan Lifting Water Supply & Sanitation (WSS) Project at Kushma-2&3 and Durlung Khurkot (incl. previous Khurkot VDC whole and Durlung VDC-5,6,8&9, Parbat (KMO/075/076/01-02):
1) Salyan Lifting WSS Project (Popn: 5,731), Kushma-2&3; and 2) Khurkot WSS Project (Popn: 3,352), Kushma-2
Parbat district2019Kushma Municipality
117WSSDetailed Engineering Survey, Design and Report Preparation of Madhyapur Thimi Water Supply Project (Popn: 147,603)*Bhaktapur district2019Bagmati Province, Ministry of Physical Infrastructure Development
118WSSPreparation of Detailed Engineering Design and Study Report of Boudeshwor WSS Project (Popn: 5,000) at Tokha Municipality-1, Jhor MahankaalKathmandu2019Tokha Municipality, Tokha
119WSSFeasibility Study and Report Preparation of:
1) Fedikhola Bazar WSS Project, Syangja
2) Labdi Khola WSS Project, Tanahun; 3) Sundar Bazar Brihat WSS Project, Lamjung
Syangja, Tanahun and Lamjung districts2019Co-finance Water Supply and Sanitation Project, DWSSM
120WSSPreparation of DPR of Different Water Supply and Sanitation Project of Kaski and Syangja districts (Popn: 5,000); Project cost: NRs. 800 million approx.Kaski and Syangja districts2019Gandaki Province, MoPID, WSSD
121BuildingPreparation of DPR of Proposed Chetwan Multipurpose Covered Hall (sport facilities), (DPR/DCH-7/348/74/75)*Chitwan district2018National Sports Council
122BuildingDetailed Assessment of the Educational and Physical Infrastructure of the Proposed Model School and Master Plan at Likhu-4Nuwakot district2018Chhetrapal Secondary School
123BuildingDetailed Assessment of the Educational and Physical Infrastructure of the Proposed Model School and Master Plan at ChaturaleNuwakot district2018Shree Mahendra HSS, Chaturale
124BuildingDetailed Assessment of the Educational and Physical Infrastructure of the Proposed Model School at Tripurasundari-1, SlyantarDhading district2018Ranipauwa Secondary School, Slyantar
125BuildingDetailed Assessment of the Educational and Physical Infrastructure of the Proposed Model School at Belkotgadhi-7, RatmateNuwakot district2018Shree Mahadev Secondary School
126BuildingDetailed Assessment of the Educational and Physical Infrastructure of the Proposed Model School at Kispang-3, KahuleNuwakot district2018Shree Aiselu Bhume Secondary School
127BuildingDetailed Assessment of the Educational and Physical Infrastructure of the Proposed Model School at Benighat Rorang-5, BishaltarDhading district2018Shree Chandrodaya Secondary School
128BuildingDetailed Assessment of the Educational and Physical Infrastructure of the Proposed Model School at Bidur-7, TupcheNuwakot district2018Shree Chandeshwory Secondary School
129IrrigationDetailed Feasibility Study on Gope Lift Irrigation Project, Bhojpur; Ranitar Lift Irrigation Project, Bojpur; Bohar Lift Irrigation Project, ShankhuwasabhaBhojpur and Shankhuwasabha districts2018Department of Irrigation (DoI), NCITP
130MasterplanDetailed Topographical Survey and Master Plan Preparation of Boudeshwor Major Project Components at Tokha, total project cost: NRs. 250 millionKathmandu2018Tokha Municipality
131MasterplanPreliminary Design and Feasibility Study of Toll Plaza in Hetauda Narayanghat Road sectionMakawanpur district2018Roads Board Nepal
132RoadDetailed Engineering Survey, Design and Cost Estimate for Road Project (Mangalbazar to Ganesh Chwok), Birendranagar MunicipalitySurkhet district2018Town Development Fund
133RoadDetailed Survey, Design, Quantity Estimate and Report Preparation of Balkhu- Chovar Road (3.1 Km)*Kathmandu2018Kathmandu Valley Road Improvement Project
134TrainingJICA funded 7 Days' Head Mason Training in Earthquake Resistance Building Construction, Package 4 (MOUD/CLPIU/NRF/SERVICE/074/075-08)Bhojpur, Khotang & Solukhumbu districts2018Central Level Project Implementation Unit (CLPIU)
135WSSDetailed Engineering Study and Design of Pisang WSP, Dhukur Pokhari WSP Nar WSP, Fu WSP, Kyang WSP, Nachai WSP and Odar-Ghalenchowk WSPManang district2018WSSSDO, Chame, Manang
136BuildingDetailed Engineering Survey and Design of View Tower at Chhampi, Karyabinayak MunicipalityLalitpur district2017Karyabinayak Municipality
137LandslideDetailed Engineering Survey, Design and Report Preparation of Begnastal- Aanandajyoti Ma. Vi. Majhthana (Ch. 0+000 to 12+000, PMEU/337123/072/73 DPR-49)Kaski district2017Department of Roads (DoR), PMEU
138RoadDetailed Engineering Survey, Design and Report Preparation of Begnastal- Aanandajyoti Ma. Vi. Majhthana (Ch. 0+000 to 12+000, PMEU/337123/072/73 DPR-49)Kaski district2017Department of Roads (DoR), PMEU
139RoadDetailed Survey, Design, Quantity/ Cost Estimates and Report Preparation of Thaiba- Badegaun- Kitini- Godabari Road section (3.45 Km)Lalitpur district2017Kathmandu Valley Road Improvement Project
140TrainingJICA funded 7 Days' Head Mason Training (MOUD/CLPIU/NRF/SERVICE/073/074-08)Myagdi, Baglung, Parbat, Syangja & Kaski districts2017Central Level Project Implementation Unit (CLPIU)
141WSSDetailed Engineering Study and Design of Bhelchhada (Kandamandu- Gairagaun- Silgadhi) Water Supply and Sanitation Project at Rajapur
Project cost: NRs. 37,0475,711.25
Doti district2017Regional Monitoring and Supervision Office, Rajapur
142WSSDetailed Engineering Study and Design of Ngawal WSP and Talekhu WSPManang district2017WSSSDO, Chame
143WSSDetailed Engineering Study and Design of Pipalla Water Supply and Sanitation Project (Lift)Doti district2017Regional Monitoring and Supervision Office, Rajapur (DWSS)
144WSSSix New Water Supply Projects:
1) Khagdal, 2) Naukilla, 3) Makhan, 4) Godhdhunga Jalbire, 5) Andheri, 6) Lakchep Lagsing
Sindhupalchowk district2017WSSSDO, Chautara
145BuildingPhalgunanda Auditorium at Damak Municipality Wards 14/15Jhapa district2016Damak Municipality
146MTMPPreparation of Municipal Transport Master Plan (MTMP) for Nagarjun Municipality*Kathmandu2016Nagarjun Municipality
147OtherSPSS Analysis of End User Survey Data of Kanuni Sasan Radio ProgramKathmandu2016Radio Nepal
148RoadDetailed Survey, Design, Estimate of Road and Drain at Various Parts of Birtamode MunicipalityJhapa district2016Birtamode Municipality
149RoadDetailed Engineering Survey and Design Works on Mali-Cherdung-Sailung-Suri Road, Dolakha (11.3 Km)Dolakha district2016Division Road Office, Dolakha (DoR)
150SupervisionBuilding Partition, Maintenance of False Ceiling and Toilet, Painting and Other Engineering Works of National Planning CommissionKathmandu2016National Planning Commission
151WSSPreparation of DRR WASH Plan of Simjung VDCGorkha district2016Nepal Water for Health (NEWAH)
152WSSDetailed Engineering Survey, Design and Cost Estimate for Kalikatar, WSSP, Brihat Gadi WSSP, Thingen WSSP, Sikhargadi WSSP & Bhalukhola WSSPMakawanpur district2016Bagmati Province, WSSD-1
153WSSDetailed Engineering Survey, Design and Cost Estimate of Mula Khola, Halchaur Water Supply and Sanitation Project, Khagenkot-5Jajarkot district2016WSSSDO, Jajarkot
154BuildingConceptual Design of Beautification Work at Ranipokhari, KMC-31Kathmandu2015Kathmandu Metropolitan City
155BuildingPhalgundanda Auditorium (Now Damak Auditorium) at DamakJhapa district2015Damak Municipality
156ManpowerSupply of Technical Manpower (Environmental Engineer)Kathmandu2015Nagarjun Municipality
157MasterplanInstallation Design of Solar Street Light and CCTV in Thamel AreaKathmandu2015Department of Tourism
158MTMPPreparation of Municipal Transport Master Plan (MTMP/MTPP) at Damak MunicipalityJhapa district2015Damak Municipality
159RoadDetailed Survey, Design, Quantity/ Cost Estimates and Road Extension Work of 1) Shantinagar Gate- Omkareshwor- Bhimsengola Chowk, KMC-34
2) Gopikrishna Hall- Saraswotinagar- Bhrikuti Chowk, KMC-8
3) Sahakari Compound- Deurali Club- Kharibot, KMC-34
Kathmandu2015Kathmandu Metropolitan City
160WSSDetailed Engineering Survey, Design and Cost Estimate of Kudhu Brihat Water Supply and Sanitation ProjectJajarkot district2015WSSSD, Jajarkot
161WSSDetailed Engineering Survey, Design and Cost Estimate of
1) Sirsa Katal – 4,5,6 WSP; 2) Jogbuda – 2,5,6 WSP; 3) Bagarkot – 7,8 WSP; 4) Debal Bibyapur – 8 WSP; 5) Bhandari – 10 WSP; 6) Bagarkot – 9, Satkatta WSP; 7) Jogbudha – 5, Kareni WSP
Dadeldhura district2015WSSDO, Amargadi (Dadeldhura)
162WSSDetailed Eng. Design & Study Report of Surki (Tamti VDC), Khadeni (Kankasundari VDC), Sanoguthiuchaur (Guthichaur VDC), Sanigaun Gora (Sanigaun VDC) & Patmara (Patmara VDC) Water Supply ProjectsJumla district2015Water Supply and Sanitation Division Office, Jumla
163HydroElectrical Resistivity Survey of Upper Ankhu Khola Hydropower Project*Dhading district2014Explorer Geophysical Consultants Pvt. Ltd.
164IrrigationDetail Feasibility Study of 1) Dudhara, (Ganeshpur) and 2) Romsouiya Nala (Basantapur) Irrigation Projects*Kapilbastu district2013DoLIDAR
165BuildingRedesign, Estimate, BoQ & Rate Analysis of Budol Shopping ComplexKavre district2012Banepa Municipally
166LandslideSurvey & Study of the Landslide at Lang Khola Sub-watershed of Bhotekoshi, Phulping*Sindhupalchowk district2012Dept. of Water Induced Disaster Prevention
167RoadDetail Survey and Design of Road Widening & Improvement Bhanimandal, Damkal Chowk (Pulchowk) and Hattiban (5.025 Km)Lalitpur district2012DoR, CRRD, DRO, Lalitpur
168RoadTesting of Kalanki- Koteshwor Road*Kathmandu2012DoR, DRO No. 2, Sanogauchar
169WSSDetailed Survey, Design, Cost Estimate & Water Quality Test of 2 Water Supply Schemes*Rasuwa district2011DDC Rasuwa